The Ed Birch Memorial Train Show was held from May 21-23 in Oklahoma City. We had participants travel from Texas and Arkansas to come to this show and help us test out some of the changes to the LGMS standards. This show was a great success, even after several last minute issues arose. Great communication at all points of the show helped us to mitigate these problems very quickly.

Before the show, the local club decided to provide all the tables to expedite the setup of the layout. This worked out well, as each participant informed the Layout Coordinator of the height their module required, and we were able to install and level all the benchwork in about 2 hours, just as the last travelling participants arrived. In 1 more hour, we had trains running on a completed loop of track. While ultimately at the discretion of the Layout Coordinator and participants, the use of club tables may speed up the setup of LGMS layouts.

Upon arrival at the show, we discovered that we had to shorten our layout by 30 inches, and one of our sides would not be viewable. After some discussion, the yard module was shortened after the relocation of the crossover switches. Some of the local participants volunteered to move their older modules to the non-viewing edge, which ensured a better view of any modules being shown for the first time.

After we had the layout in operation, we discovered that there was a slight elevation to one side of the display, which was noticed when trains would slow down in one direction. This would have been remedied if we had used a level while setting up tables, rather than measuring every single table from the floor.

The second day of the show it was discovered that some areas of track had settled, and created bumps and ridges that would disconnect trains that used Kadee couplers. The adjustable table legs allowed for this to be fixed much quicker and easier than if we had used shims. After this was remedied we had no further issues with any trains.

The use of the switching puzzle added an extra option for operating trains while the mainlines were in use. We also were able to have a short operating session using this switching yard and multiple sidings. More in depth operations will be tested in the future, and we hope to release a guide to help groups get started in this aspect of the train hobby.

After two and a half days of operating trains we proved many of the proposed changes to the LGMS standards to be successful. Included is a photo gallery, which showcases several of the modules that would not have been possible under the old rules. We hope that everyone can be inspired to work on creative new modules!